Laserfiche WebLink
SWRCB, January 2002 REC@VED <br />6. PIPING SUMP TESTING <br />Test Method Developed By: F Tank Manufacturer ' Industry Standard F Professional IMM44 gni <br />Other (Specify) <br />Test Method Used By: Pressure r Vacuum Hydro VIR <br />F Other (Specify)HEALTH <br />AL <br />Test Equipment Used: VPLT <br />Equipment Resolution: 0.00001 in. <br />STP Containment for <br />Tank T1: RUL - 1 <br />STP Containment for <br />Tank T2: PUL - 1 <br />STP Containment for <br />Tank T3: Diesel - 1 <br />Sump Diameter/Dimensions: <br />48 in. <br />48 in. <br />48 in. <br />in. <br />Sump Depth: <br />59.00 in. <br />59.00 in. <br />59.00M'. <br />in. <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Hi hest Pinina Penetration: <br />12.00 <br />12.00 <br />12.00 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />7.00 <br />7.00 <br />7.00 <br />Condition of sump prior to testing: <br />good <br />good <br />good <br />Portion of Sump Tested, <br />14 <br />14 <br />14 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />C Yes r No r NA <br />ro Yes r Nor NA <br />ro Yes r No r NA <br />t"" Yes r Nor NA <br />Turbine shutdown response time <br />02:00:00 sec <br />02:00:00 sec <br />02:00:00 sec <br />sec <br />Is system programmed for fail-safe <br />shutdown?* <br />C Yes r No r NA <br />C« Yes r Nor NA <br />C Yes r Nor NA <br />C Yes r Nor NA <br />Was fail-safe verified to be <br />o erational?* <br />C Yes r Nor NA <br />ro Yes r Nor NA <br />£o Yes r Nor NA <br />r Yes r Nor NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />5 min <br />5 min <br />5 min <br />min <br />Test Start Time: <br />10:00:00 <br />10:00:00 <br />10:45:00 <br />Initial Reading (RI): <br />0.00000 in. <br />0.00000 in. <br />0.00000 in. <br />Test End Time: <br />10:30:00 <br />10:30:00 <br />11:15:00 <br />Final Reading (RF): <br />-0.00140 in. <br />-0.00060 in. <br />-0.00100 in. <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -Rt) : <br />-0.00140 in. <br />-0.00060 in. <br />-0.00100 in. <br />Pass/Fail Threshold or Criteria: <br />+/-0.00200 <br />+/-0.00200 <br />+/-0.00200 <br />Test R�stlt <br />Was sensor removed for testing? <br />Pass <br />t+ Yes 1r" No t NA <br />Pass--,: <br />C« Yes f Nor NA <br />Pass <br />10 Yes r No r NA <br />v <br />r Yes C Not" NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />t: Yes r No C NA <br />ro Yes C No C NA <br />ro Yes C No C NA <br />r Yes C Nor NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. <br />WO: 2317502 <br />