My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 I <br />5 WRCB, January 2002 «IR C,Page 1 of 1 <br />7. UNDER -DISPENSER CONTAINMENT (UDC)' <br />Test Method Developed By: ' UDC Manufacturer rY—",, Industry Standard v_ Professional Engineer <br />r Other S eci <br />Test Method Used By: r Pressure r Vacuum r%0-0',' Hydrostatic <br />r Other (Specify) <br />Test Equipment Used: VPLT <br />Equipment Resolution: 0.00001 in. <br />UDC Manufacturer: <br />UDC # 1/2 <br />gilbarco <br />gilbarco <br />gilbarco <br />gilbarco <br />UDC Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />30.00 <br />30.00 <br />30.00 <br />30.00 <br />Height from UDC Bottom to Top <br />of Highest PipinE Penetration: <br />11.00 <br />11.00 <br />11.00 <br />11.00 <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />17.00 <br />13.00 <br />12.00 <br />15.00 <br />Condition of UDC prior to <br />testin : <br />good <br />good <br />good <br />good <br />Portion of UDC Tested' <br />13 <br />13 <br />13 <br />13 <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />r Yes r No r NA <br />f+ Yes f No C NA <br />r Yes f ` No r NA <br />fo Yes r No r NA <br />Turbine shutdown response time <br />03:00:00 sec <br />03:00:00 sec <br />03:00:00 sec <br />03:00:00 sec <br />Is system programmed for fail- <br />safe shutdown?* <br />C yes r No r NA <br />ro Yes r Nor NA <br />C Yes C No r NA <br />G Yes r No r NA <br />Was fail-safe verified to be <br />operational?* <br />C yes r No r NA <br />t+ Yes r No r NA <br />0 Yes t"' Nor NA <br />C Yes r Nor NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />12:44:00 <br />12:44:00 <br />13:05:00 <br />13:05:00 <br />Initial Reading (RI): <br />0.00000 in. H2O <br />0.00000 in. H2O <br />0.00000 in. H2O <br />0.00000 in. H2O <br />Test End Time: <br />12:59:00 <br />12:59:00 <br />13:20:00 <br />13:20:00 <br />Final Reading (RF): <br />-0.00110 in. H2O <br />-0.00100 in. H2O <br />-0.00040 in. H2O <br />0.00070 in. H2O <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF -RI) : <br />-0.00110 in. H2O <br />-0.00100 in. H2O <br />-0.00040 in. H2O <br />0.00070 in. H2O <br />Pass/Fail Threshold or Criteria: <br />+/-0.00200 <br />+/-0.00200 <br />+/-0.00200 <br />+/-0.00200 <br />Was sensor removed for testing? <br />G Yes f Nor NA <br />�.. <br />G Yes r, No r NA <br />Passe : <br />Co Yes r No C NA <br />Pass <br />r Yes 47 No P NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />C yes r Nor NA <br />+ Yes r Nor NA <br />is Yes r Nor NA <br />r Yes r No r NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (•) is "NO" or "NA", the entire UDC must <br />be tested. <br />WO: 2314294 <br />
The URL can be used to link to this page
Your browser does not support the video tag.