My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 1:25:02 PM
Creation date
6/3/2020 9:45:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i i <br />• Consulting <br />—i, ,, <br />14351 Euclid Street, Suite 1-S Garden Grove, CA 92843 4307 Valley Avenue, Suite 3 Pleasanton, CA 94566 <br />Tel (714) 487-7173 Fax (800) 342-0507 Tel (925) 989-6364 Fax (800) 342-0507 <br />San Joaquin County Environmental Health Department <br />1868 E. Hazelton Ave. <br />Stockton, CA 95205 <br />Re: Correction Letter <br />3202 W. Hammer Ln <br />Stockton, CA 95209 <br />1. Sheet G0.3 Keynotes #7 states "Xerxes 42 inch round sump ..." According to the plans Western <br />Fiberglass sumps are being installed. Please change #7 if Xerxes sumps are not being used. <br />• See revised sheet G0.3 — Xerxes sumps will be used. <br />2. Provide third party approval information (UL or equivalent) for the Western Fiberglass tank top <br />sumps. <br />• N/A, Xerxes sumps will be used. <br />3. Are Xerxes tank containment collars being installed before adding the Western Fiberglass fill sumps <br />OR are the Western Fiberglass (WF) fill sumps being installed using WF sump riser tubes? <br />• Both collars and sumps will be Xerxes, and installed by Xerxes Mfg reps. <br />4. Provide the WF bond kit part numb for the sump install. <br />AN� bond ltiipaft#Alt�8 7ye_-p_ <br />5. Western Fiberglass UL listed tank top sumps have the UL labeling on the slump. Will the sumps <br />being installed have the UL labeling? <br />6. Clarify who is installing the Western Fiberglass sumps and riser tubes and the Xerxes tank collars (if <br />used). If LC services is doing this work then provide WF and Xerxes training certifications. <br />• Xerxes mfg representatives will be installing the Xerxes sumps. <br />7. The plans state that a WF manufacturer field representative is installing the tank collars and sumps. <br />Are you using WF tank collars (riser tubes)? <br />• Response same as #3 above. <br />8. Provide Tim Hardin's stainless steel flex line training certification. <br />• See attached training certifications <br />9. Provide stainless steel flex line part numbers and 3`d party approval document (UL or equivalent). <br />Parts are identified as FX -02 and FX -03 on the plans but are not included in the equipment schedule. <br />• See attached UL certification information <br />10. Is the monitoring panel being cold started and the alarm history being erased? To install ISD this <br />may be necessary. <br />• All data will be saved prior to construction start. <br />925-209-9969 <br />
The URL can be used to link to this page
Your browser does not support the video tag.