Laserfiche WebLink
C <br />D. Results of Testing/Servicing <br />Software Version Installed: 332.00 <br />Complete the following checklist: <br />►J <br />ro Yes <br />r No* <br />Is the audible alarm operational? <br />• Yes <br />r No* <br />Is the visual alarm operational? <br />o Yes <br />r No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />*` Yes <br />r No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br />heir proper operation? <br />Yes <br />r No* <br />f alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />o; N/A <br />120 Yes <br />"' No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring <br />t ` N/A <br />system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check <br />all that apply) S/ Sump/Trench Sensors; r Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ft Yes; C No <br />Yes <br />,' No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill <br />N/A <br />prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If <br />so at what percent of tank capacity does the alarm trigger? % <br />* Yes* <br />r No <br />Nas any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E below. <br />• Yes* <br />r° No <br />as liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />V Product; r Water. If yes, describe causes in Section E below. <br />o Yes <br />No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />,, Yes <br />. No* <br />lIs all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />disp 7/8 die shear valve not functioning correctly, 87 bravo on disp 7/8 float not floating and needs to be replaced. FLAPPERS PRESENT, but ext alarm horn <br />is non functional. v.r. battery was bad and was replaced. 30ml of liquid pumped out of die stp sump. mon cert inconclusive due to 87 bravo float. <br />Monitoring System Certification Page 2 of 3 12/07 <br />