Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by END) <br />1. Site map enclosed? YES N NO [] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (if <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />—Remove dispenser if required to gain access to the #7 diesel shear <br />.r• -•.am Moll WEN M a r- •. IMF.r• •. • •r s • - - <br />• '-9 we-TWUM sm O- e] $11111r. IFIN gas -t .M0 �. 11•• • /• -II <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />3 <br />