Laserfiche WebLink
BOARD OF TRUSTEES' - <br />James CuIbonson. <br />RUSTEES-dames-Culbertson, Pres. <br />Patricia E. Vannucci. Sa-c'y: <br />Anthonetfe Van•Spronsen <br />Earl Pimentel <br />Fern 8u®bee <br />Oanlef U. Flores <br />John 0. Mast, M.D. <br />William J. Wade <br />Mary Anna Love <br />SAN JOAQUIN LOCAL HEALTH ®ISTRICT <br />1601. East Hazelton•Avenue, P.O. -Box 2009 <br />Stockton. California 95201: <br />209/466-6781 ,. <br />Jo®l Khanna. M.D.. M.P.H.. District Health Officer <br />SHEET #2 <br />Facility Name San Joaquin Co. Public Works - Hazelton Complex <br />0 <br />Address 1810 E. Hazelton Ave., Stockton <br />Date of Inspection Inspector <br />MONITORING ALTERNATIVE #7 Tanks #4 and #5 <br />SERVING <br />City of Codi <br />San Joaquin County <br />-City_ of E3C®Ion <br />City of Manteca <br />City of Ripon <br />City of Stockton <br />City of Tracy <br />San Joaquin County <br />San Joaquin County <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liquic, level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />i/ Tank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />/Tank <br />withdrawals. <br />must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />Precision test(s) must be performed by _fend results submitted to this <br />office within 30 days of the test. <br />Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 11GT 3 <br />