My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1986-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 1:00:00 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1997
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1986-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DIVISION <br />SITE HEALTH AND SAFETY PLAN <br />PART I <br />GENERAL SITE -INFORMATION <br />1. Site Name:. <br />Address: to <br />Contact Person: tl - Phone No. <br />Sweeps Number: <br />Proposed Date of investigation/inspection. <br />2. Description and brief narrative of inspection activity: <br />[ ] New UST Installation [ ] UAR Investigation <br />(j Tank Closure in Place [ ] Tank/Pipe Repair <br />Tank/Pipe Removal [) Re -excavation <br />[ ] Installation of Borings/Monitoring Wells <br />3. Specific Site Information: <br />Tank No. Tank Capacity: 1310 <br />Tank Age: <br />Tank Contents: �(C CSS-�iCl�' g <br />Other: <br />4. Type of Operation: <br />Release History: <br />Evidence of leaks/soil contamination: [ ] YES [ ] NO <br />Documented Groundwater contamination: [ ] YES [ J NO <br />Background and description of any previous investigation <br />or incidence: <br />Potential Health and Safety <br />Physical Concerns: (check all that apply & describe) <br />[ ] Heat or Cold Stress: of (high ambient temp.) <br />FA Noise Source: <br />] Oxygen Deficiency: <br />[ xcavation: (falls, trips ,slipping, cave-ins) <br />] Handling and Transfer of a Hazardous Substance: <br />(fire, explosions, etc.) <br />[ ] Confined Space entry: (explosions) <br />[ j}hieavy equipment (physical injury & trauma resulting <br />/ from moving equipment) <br />[ ] Other, specify <br />7. Anticipated Biological Hazards: <br />[ j Snakes.- ( ) Insects [ ] Rodents <br />[ ] Other/Unknown (specify): <br />[ ] Poisonous Plants <br />8. Narrative (provide all information which could impact Health <br />and Safety, e.g., power lines, integrity of dikes, terrain, etc.): <br />12 <br />PART II <br />EVALUATION OF POTENTIAL HAZARDS <br />1. Chemicals Hazards <br />Carcinogens: <br />[) Corrosives: <br />[ ] Dusts: <br />Explosives: <br />Flammables: <br />] Inorganic Gases: <br />[ ] <br />Metals: <br />[ J Oxidizers: <br />[ ] PCB's: <br />PART III <br />REQUIRED PERSONAL PROTECTIVE <br />EQUIPMENT <br />1. Monitoring Equipment: (note: Monitoring <br />instruments must be used for all operations <br />unless appropriate rationale or restrictions are <br />provided) <br />[ ] Combustible Gas/Oxygen Meter <br />(] Detector Tubes (Specify) <br />[ ] Photoionization Detector <br />[ J Organic Vapor Analyzer <br />[ ] Other, specify: <br />If monitoring instruments are not used, <br />rationale or activity /area restrictions: <br />2. Personal Protective Equipment <br />Level of Protection: [ ]A [ ]B [ ]C D <br />Hard hat <br />Safety glasses/goggles <br />Steel toed/shank shoes or boots <br />[ j Flame retardant coveralls <br />Hearing protection <br />Tyvek <br />Respirator, circle: AP or SCBA <br />A/P cartridge: <br />(J Safety vest <br />[ ] Two-way communication <br />PART IV <br />PLAN APPROVAL <br />Plan Prepared by: - f . <br />Plan Approved by: <br />Date: /q <br />Date: GU I <br />
The URL can be used to link to this page
Your browser does not support the video tag.