My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:02:37 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br />TAiT &ASSOCIATES, INC. <br />CONSULTING ENGINEERS Civil • Planning • Surveying - Environmental <br />February 9, 1999 <br />Via: Fax U.S. Mail <br />Jim Cornell <br />Stockton Service Station Equipment Company, Inc. <br />808 N. Union Street <br />Stockton, CA 95205 <br />San Joaquin County Corporation Yard <br />Primary Underground Piping <br />TAIT Job SP3952 <br />Dear Mr. Cornell: <br />As a result of discussions between the Public Works Department and the Health Department <br />regarding the fiberglass piping installation, it was determined that the project will only be <br />allowed to continue once the following action is taken to rectify the concerns of the above <br />Departments due to the appearance of the installation. <br />The quantity of glue at the joints concerns the Departments and does not appear to be in <br />compliance with the manufacturer's installation instructions. The action that will satisfy the <br />County inspectors is as follows: <br />Required Action <br />Perform a hydrostatic cyclic test as recommended by A.Q. Smith in Manual #132160, <br />dated July 15, 1996. During discussions with the Health Department the following <br />issues were clarified: <br />a) The impact valves at dispenser sumps are to Ve removed and the flex <br />connector capped prior to testing system. <br />b) Test to be run to 375 psi and in conjunction with A.O. Smith Test <br />Procedure (Section 1.7.2 of above -referenced manual). <br />C) Test shall be run on 1) Gasoline Primary, 2) Diesel Primary, and 3) <br />Diesel Satellite product lines. The cyclic pressure test is not required on <br />the vent and vapor recovery lines. The pressure is to be kept on each <br />individual system without pressure fluctuation for one hour prior to <br />system obtaining approval. <br />d) Once cyclic pressure is complete and systems are deemed tight, the <br />impact valves shall be reinstalled, and the air pressure test per the <br />project -approved plans would need to be completed prior to final primary <br />system approval. <br />2880 Sunrise Boulevard. - Suite 206 • Rancho Cordova, CA 95742 (916) 635-2444 • (916) 635-2606 FAX <br />Other Locations: Orange, CA • San Diego, CA - Concord, CA • Phoenix, AZ • Tucson, AZ <br />Established 1964 <br />
The URL can be used to link to this page
Your browser does not support the video tag.