Laserfiche WebLink
Mar -X18-99 02:47pm From-TAIT & ASSN S/TAIT ENVIR MGMT (TEW 7145606235 T-150 P 05/05 F-293 <br />San Joaquin County of Public 'Works March 18, 1999 <br />Workplan for Site Assessment <br />Task 4: Report Preparation <br />Upon completion of the field work and receipt of the analytical results, a report will be <br />prepared by TEM. The report will include soil boring logs, well, permits, as -built construction <br />details of groundwater monitoring wells, analytical results of both sail and groundwater <br />samples, isoconcentration neaps for TPH, benzene and MTBE, a groundwater contour map <br />depicting the hydraulic gradient and direction of groundwater flow across the SITE, and the <br />current groundwater elevation data. <br />ha • I MetW144 .1 1 <br />The proposed work can be initiated upon written approval of the workplan by SJCPHS. A <br />final report can be submitted to the SJCPHS within 60 days of completion of the field work <br />and receipt of all laboratory reports and disposal manifests. <br />Should you have any questions regarding this workplan, please contact any of the undersigned <br />at ('714) 560-8200 at your convenience. <br />Very truly yours, <br />TAIT EINVIRONINMNTAL MANAGOdENT, PNC. <br />Edward A. Badle Richard L. Coffman, Ph.D., R.G. <br />Director Senior Geologist <br />Attachments: Figure 1 - Site Plan with Proposed Well Locations <br />Cc: Stan Iverson <br />M: %TGM2iC1 icntsrSM110AQUiNe,,anjoaqukroorW&n, dcx <br />9 <br />