My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:02:37 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN-25�-1999 11-'41 <br />AIT & ASSOCIATES P.07/08 <br />SRn Jm*dn Cowty -of Publk Works <br />WorkPlan for Site Assessment <br />januau 159 L999 <br />In Area 4, thO Soil samples will be analyzed for total recoverable petroleum hydrocarbons <br />using EPA Method for TRPH418.1. The highest co=entrationof TRpH will be used to <br />analyze Title 22 CAM 17 tneWs, PCB, Organ0chl0rides and Pesticides using EPA Method No. <br />8080, chlorinated hydrocarbons using EPA Method No. 5030/8Z40, and BTEX using EPA <br />Mediod No. 8010/8020. All analytical data will be reported by a Califomia-Certified <br />laboratory. <br />Task 9: Report Preparation <br />Upon completion of the field work and receipt of the analytical results, a report will be <br />Prepared by TEM. The report will include soil boring logs, well permits, as -built construction <br />details of groundwater monitoring wells, analytical results of both soil and groundwater <br />Samples, isoconcentration maps for TPH, bemne and MTBE, a groundwater contour map <br />depicting ale hydraWic gradient and dirOctiOn of groundwater flow across the SITE, and the <br />current groundwater elevation data, <br />L4x4_1j �[* C1149 .1 IAIUM <br />The proposed work can be initiated upon writtm approval of the workplan by SJCPHS. A <br />final rcjM on <br />and receipt of all laboratory reports and disp=1 Manifeg(S. <br />Should you have any questions regarding this workplan, please contact any of the undersigned <br />at (714) 560-8200 at your convenience, <br />Edward A. Batile Richard L. Coffman, Ph.D., R.G. <br />Director Senior Geologist <br />Attachments: Figure I - Site Plan with Proposed Well Lkxafions <br />Cc: Stan Iverson <br />M:1TEM2�CliCMSa CLAQUIN'Nn.twAWkmripLVLdou <br />r-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.