Laserfiche WebLink
D. Results of Testing/Servid <br /> M <br /> Softtivare Version Installed: <br /> - r <br /> Com Tete the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> Yes ❑ No* Is the visual alarm operational? <br /> es ❑ No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> es ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment wil <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem; <br /> _ p f•1%q operational? <br /> es ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut. down? (Check all that apply) mp rench Sensors; M4Nspenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? , No. <br /> El Yes El No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> /A mechanical overfill prevention•valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br /> El Yes* o Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> .and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* o Was liquid found inside any secondary containment systems designed as dry systems? (Check all that appl)) <br /> ❑Product; ❑Water. If yes, describe causes.in Section E,below. <br /> Y -E3 No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes El No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comnients: <br />