Laserfiche WebLink
SWRCB,January 2002 <br /> 9. SpWOVERFILLrCONT-UNWNT BO <br /> Facility is Not Equipped With Spill/overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum y rostatic <br /> ❑Other(Specify) - <br /> ;E"quipmen;tR;e;solutionw:. <br /> Test Equipment Used: <br /> Spill Box#f' lt Spill Box# Spill'Box# Spi11 Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: CCIV - <br /> Initial Reading(Rt): w <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): -- <br /> Pass/Fail Threshold or M �� <br /> Criteria: <br /> Test Result ss ❑Fail ass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> CommeII►1r5—(include in ormation ort re airs made for to testing, and recommended follow-up for failed tests) <br /> �- <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Attn: Scott Bacon <br /> 1001 "1" Street,Box 944212 <br /> Sacramento,CA 95814 <br /> Phone: (916)341-5873,Fax: (916)341-5808 <br /> e-mail: bacons@cwp.swrcb.ca.gov <br />