My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:08:22 PM
Creation date
6/3/2020 9:45:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: SJC Public Works Corp Yard, 1810 E. Hazelton, Stockton, CA (SR0055544) <br />4. All components must be certified by an independent testing organization and <br />labeled as required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See <br />California Code of Regulations (CCR), Title 23 Chapter 16 Table B for complete <br />list). The component must bear the appropriate mark as required by the <br />independent testing organization. <br />5. Any changes in information and scope of work must be submitted to EHD for <br />approval prior to commencing work. All new addenda supersede the previous <br />ones. <br />6. Contact Jeffrey Wong to arrange the following inspections (a 48 hour notice <br />is required): <br />a. Verify the new sensor is properly located to detect a leak at the <br />earliest opportunity and functions normally. <br />7. An "Underground Storage Tank Certification of Installation/Modification" form <br />(form C) shall be submitted by the owner or the owners' agent [pursuant to (CCR) <br />2635(d)] before this repair will be considered complete by the EHD. <br />If you have any further questions, please contact me at (209) 468-0335, fax to (209) 468- <br />3433 or email to jwong@sjcehd.com. <br />Thank you, <br />PIAJ <br />Jeffrey Wong <br />Senior Environmental Health Specialist <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.