Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />■ Sump Manufacturer 17br + d. , <br />■ ■ r,a f, <br />Page 2 of 2 <br />❑ Professional Engineer <br />Test Equipment Used: C <br />Equipment Resolution <br />Sump # <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter. <br />' <br />Sump Depth: <br />Art <br />Sump Material: <br />: s <br />Height from Tank Top to Top of <br />Highest PipinS Pip'Penetration: <br />ti <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />C -" &u3 <br />Portion of Sump Tested' <br />n <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />raluct and water)?* <br />&4es ❑ No ❑ NA <br />❑ Yes ❑ No [INA <br />❑ Yes ❑ No [INA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />5 a n -s <br />Is system programmed for fail-safe <br />shutdown?' <br />es ❑ No ❑ NA <br />❑ Yes ❑ No [INA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?" <br />es ❑ No 11NA <br />11 Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />Wait time between applying <br />pres acu aterand starting <br />test: <br />`` > <br />Test Start Time: <br />Initial Reading (114): <br />r c° - <br />Test End Time: <br />Final Reading (RF). <br />Test Duration: <br />30 <br />Change in Reading (RF -R& <br />�o <br />Pass/Fail Threshold or Criteria: <br />azo <br />Test Result: <br />ass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />Wles ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after le stin ? <br />es ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑Yes ❑ No 11 NA <br />❑Yes 11 No 101 NA <br />Comments — <br />r <br />If the entire depth of therras is not .r specify how much was isted. If ther _M of r` questions indicated with an <br />asterisk (*) is • or r+r i be ;i :1:; <br />