Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: L! Check this box if tank gauging is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the follo ing checklist: <br /> LJ Yes L3 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> • Yes U No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> testing or ground faults? <br /> P*' <br /> • Yes U No* Was accuracy of system product level readings tested? <br /> • Yes- U No* Was accuracy of system water level readings tested? <br /> • Yes Ll No Were all probes reinstalled properly? <br /> El Yes U No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): El Check thisbox if LLDs are not installed. <br /> Complete the follo ing checklist: <br /> F 3-Y <br /> Y <br /> El-Yes <br /> Yes El-Yes U No* For equipment start-up or annual equipment certification, was a leak simulatedtoverify LLD performance? <br /> U N/A (Check all that apply) Simulated leak rate: W g.p.h.; U 0.1 g.p.h; U 0.2 g.p.h. <br /> s <br /> Ll Yes U)-No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes <br /> U Yes U No* Was the testing apparatus properly calibrated? <br /> U <br /> Y <br /> s <br /> A3-,Yes U No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 11-'Y <br /> El N/A <br /> Yes <br /> U Yes U No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> L3 Y <br /> El. N/A <br /> Yes <br /> UYe U No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> W N/A or disconnected? <br /> U Yes U No* For electronic LLDs,does the turbine automatically shut off, if any portion of the monitoring system malfunctions <br /> 91,N/A or fails a test? <br /> Ll Yes U No* For electronic LLDs,have I ve all accessible wiring connections been visually inspected? <br /> aN/A <br /> Yes ' U No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />