My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:08:22 PM
Creation date
6/3/2020 9:45:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing t <br />Software Version Installed: 3 7 ®Zi <br />Co Tete the following checklist: <br />Yes <br />❑ No* <br />Is the audible alarm operational? <br />Yes <br />❑ No* <br />Is the visual alarm operational? <br />O.Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />JW <br />not interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />N/A <br />operational? <br />Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to opere, or is electrically disco ected? If yes: which sensors initiate <br />Dispenser <br />positive shut -down? (Check all that apply) 4 Sump/Trench Sensors; Comment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? 0 Yes; ❑ No. <br />❑ Yes <br />❑ Flo* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />W'N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />QP <br />fill oint(s) and o eratin ro 1 ? If so, at what percent of tank ca aci does the alarm tri er? <br />❑ Yes* <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br />Product; ❑ Water. If yes, describe causes in Section E, below. <br />Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure Eloper sett' ? Attach set u reports, if applicable <br />Yes <br />❑ No* <br />Is all 9Ng!!2!±g a ui Ment 2perational per manufacturer's s ecifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />Page 2 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.