Laserfiche WebLink
C <br />7 <br />n <br />_W W <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE I <br />TYPE OF ACTION ❑ 1. NEW PLAN ffi 2. CHANGE OF INFORMATION <br />Mol. <br />PLAN TYPE Q' MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />Moz. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): SAN JOAQUIN COUNTY PUBLIC WORKS CORP YARD <br />I. FACILITY INFORMATION _ <br />_ <br />(Agency Use n y _... - <br />BUSIN ESS NAME ame as <br />SAN JOAQUIN COUNTY PUBLIC WORKS CORP. YARD <br />BUSINESS SITE ADDRESS <br />M04 -CITY 6 1 UCKTON M05. <br />M03. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed at <br />the frequency specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by <br />qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED 1. ANNUALLY Mo6. ❑ 99. OTHER (Specify): <br />Moz <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />form, Hazardous Materials Business Plan map,etc.) which shows all required information include it with this plan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />Mlo, <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT I a. DRY ❑ b. LIQUID FILLED M C. PRESSURIZED ❑ d. VACUUM <br />I <br />PANEL MANUFACTURER: VEEUtR ROOT M12. MODEL #: TLS 3'70 <br />M13. <br />LEAK SENSOR MANUFACTURER: VEEDER ROOT M14. MODEL #(S): TLS <br />M15. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: M16. MODEL #: <br />M17. <br />IN -TANK PROBE MANUFACTURER: Mls. MODEL #(S): <br />M19. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHERS i Mzz. <br />g.p.h. g.p.h. (Specify): <br />M23. <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): M26. <br />M27. <br />❑ 6.VISUAL MONITORING: ❑ a. DAILY ❑ b. WEEKLY <br />❑ 99. OTHER (Specify): <br />M28. <br />V. PIPE MONITORING; <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />M30. <br />�f 1. CONTINUOUS MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />M31. <br />PANEL MANUFACTURER: VEEDER ROOT M32. MODEL #: TLS 350 <br />LEAK SENSOR MANUFACTURER: VEEDER ROOT M34. MODEL #(S): <br />M3 <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? I& a. YES ❑ b. NO <br />M36. <br />WILL FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO <br />M37. <br />(a 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />Mas. gq"Gba®Q® <br />M39. <br />MLLDMANUFACTURER(s): VMS MODEL #(S). <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER(s): Moo. MODEL #(S): <br />M41. <br />PROGRAMMED IN LINE TESTING: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M44 <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: ❑ a. ANNUALLY ® b. EVERY 3 YEARS ❑ c. OTHER (Specify) M45. M46. <br />❑ 5. VISUAL MONITORING: ❑ a: DAILY ❑ b. WEEKLY ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* <br />M47. <br />° Allowed for monitoring of unburied emergency generator fuel piping only per HSC §25281.5(bx <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />M48. <br />hwfwrc-d (9/24/04) - 1/4 <br />