My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:08:22 PM
Creation date
6/3/2020 9:45:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> AGLEY ENTERPRISES.) INC. <br /> LIQUID LING SOLUTIONS" <br /> 2370 Maggio Circle,Unit#4,Lodi,CA 95240-8828 <br /> T#:(209)367-4800/F#:(209)367-5424 <br /> Contractor's License#774802 <br /> wwiv.bagleyenterprisesxopi i <br /> SITE SPECIFIC SCOPE OF WORK TO ACCOMPANY PERMIT SUBMITTALS TO <br /> AGENCIES HAVING JURISDICTION CONCERNING PHASE II EVR UPGRADES IN <br /> ACCORDANCE WITH GARB EXECUTIVE ORDER VR-20 -H(Not including ISD). <br /> Re: San Joaquin County Public Works,Corporation Yard located at 1810 E.Hazelton <br /> Avenue,Stockton,CA 95205 <br /> In general,we will comply with all requirements outlined in Exhibit 2 of Executive Order VR- <br /> 201-H which contains the installation,maintenance and compliance standards and specifications <br /> applicable to the Healy Phase II EVR System. <br /> 1) Specifically,we will install the following equipment: <br /> One(1)Healy VP 1000 vacuum pump with dispenser interface module and mounting kit. <br /> One(1)Healy electrical installation kit. <br /> One(1)Healy vapor installation kit. <br /> One(1)Healy clean air separator tank. <br /> Two(2)Healy 12"whip hoses. <br /> Two(2)Healy 8'6"product hoses. <br /> Two(2)Healy breakaway valves. <br /> Two(2)Healy EVR approved nozzles,new with black scoff guard. <br /> One(1)Husky Pressure/Vacuum Vent Cap P/N 5885 <br /> 2) We will start up all new equipment for warranty purposes. <br /> 3) We will schedule and coordinate all third-party testing. <br /> 4) We will schedule and coordinate all final inspections with all agencies concerned. <br /> 5) Estimated installation downtime should not exceed three consecutive days. <br /> 6) Expected impact on customer service should be minimal. <br /> 7) Estimated time to completion should not exceed thirty''',calendar days from start date, <br /> including third party testing and approval by all authorities having jurisdiction. <br /> 8) Estimated project start date will be within thirty days of acceptance of submittals with <br /> estimated completion date within thirty days of start date. The project should be <br /> completed no later than the required date of completion of April 1,2009. <br /> Respectfully submitted, <br /> Jose agley <br /> General Manager <br /> Atch:Exhibit 2 of VR-201-H;Site Plans;Drawings;Spec Sheets <br />
The URL can be used to link to this page
Your browser does not support the video tag.