Laserfiche WebLink
t <br /> s <br /> ARS Approved IDM—Healy Phase 11 EVIR System— -201-A(Breakaway—8701VV) Page 27 <br /> Healy Model8701 Breakaway <br /> MOPENamH@At.Y l� If Y Ems® <br /> PAKr NO.67"W WMAJIUMAY PME BItm / <br /> AsmwmYa _- <br /> 8 <br /> a The Healy Breakaway Is dd y led Hamde o- 4 <br /> carefully to avoid d Ing and�or toeing the etas a <br /> shownm <br /> ■ Failure to remove the Shear screw(Ite1)as described Its <br /> Stop 1 below could result in Wacturling or shearing of the screw <br /> The Shear screw w0l require reploevnent If <br /> ■ Be sure to assemble parts in the exact as shown below. <br /> ■ Be sure to lubricate a6 o-rkW and quad sods where Indicated. <br /> Use of ordinary motor oil is sufficient. PIGTAIL <br /> ■ Do not use thread-waling compounds an straight thread. <br /> YIN 4 <br /> (rofor to diagram at rust) <br /> T <br /> 1.Remove the Shear Saw(Item 1)and the POddng mat s. TH <br /> Separate the hrdves of the brookoway cseornblK retaining the 6 <br /> I— <br /> Internal valves.(items 2 t 3)and the spring(Item 13) <br /> inside the upper WE 5 <br /> 2 Seled the pkItall,(whip hose)aswnbly.Lubricate the quad 13 <br /> and oris its(tens 4,5,8,&shaTpht thread,Item 8). <br /> As ula pigtdll to the caput half of the Bro (Kwn 7) 14 <br /> being sure that the larger and of the conical spring is await rings <br /> in the groove an the white aolvs.Tighten hose to Broakaway at Install as 2 <br /> 35 foot pounds,ds,Be sure the vapor tube fftm orkles eady Into shown <br /> itern 2 before final tightenkKj. <br /> 3.Select the delivery hose lubricate the o-ring(Itmn 4).the quad 7 <br /> enol(Iters 5)and straight threadItem 8). bale the end with <br /> the quad sal to the output half of the Brealcoway(Iters 10). BREAKAWAY <br /> install the hase and tighten to 35 foot powds,Bo sure 12 <br /> the vapor tube fitting sbldw acelly into itan 3 before£anal tightening. &JGNMENT <br /> PIN <br /> 4.Carefully fit both halves of the Brookoway together.Utlki ng <br /> the all Mont pin,fully compress bods halves the t <br /> Shear Screw then t)and hand tighten.Final tighten to 29 SPARF <br /> Indo po unde.Tools should not be necessary to Initially start 10 <br /> the screws. <br /> tt <br /> t4 1—UT _ 3 <br /> � t 701 t 14 <br /> 13 1we <br /> a $ <br /> t eerr. <br /> :t t-ena a8 6 <br /> 1 Dna show <br /> 0 Y <br /> $ 4 } SE4 <br /> 4 <br /> ! �7W�711 lift _ <br /> e 1 t -t0 wl%t 7 <br /> t t DEAL WIL 70 <br /> N0. aM t 1� 001100MM P 1 <br /> PRODUCTTO <br /> Healy Systems, Inc. Website: http:/ANww.heaiysystems,com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation,Operation and Maintenance Manual(April 8,2005) Fax:603.882.5189 <br /> Healy Systems, Inc_ —the innovative leader in Stage 1)vapor recovery equipment <br />