Laserfiche WebLink
UNDERGROUND STORAGETANK <br /> RESPONSE PLAN-PAGE I (One form per facility) <br /> I <br /> TYPE OF ACTION 0 LNEW PLAN 2.CHANGE OF INFORMATION <br /> 1. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) - L-T - 1 —1 _J <br /> BUSINESS NAME(Same as FACILITY NAME) SAN JOAQUIN COUNTY PUBLIC WORKS CORP YARD <br /> BUSINESS SITE ADDRESS 1810 E.HAZELTON AVE. R03.CITY R04 <br /> STOCKTON <br /> 11. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from LIST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and seated cont�ain r. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> > We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> L Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete only if applicable) <br /> isEQUIPMENT LOCATION AVAILABILITY <br /> R10. R20. R30- <br /> R11. R21. P31. <br /> R12 R22. R31 <br /> R13. R23. R33. <br /> R14. IU4. R34. <br /> R15. R25. R35- <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40- TITLE R5Q <br /> DAN MCCANN FLEET MANAGER <br /> NAXIE R41- TITLE R51, <br /> NAME R42 TITLE R52- <br /> NAVE R43. TITLE R53. <br /> V. INDIRECT HAZARD DETERMINATION <br /> This information is required only when the presence of the hazardous substance can not be verified directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO VERIFY THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R60. <br /> hwfwrc-e(9/24/04)-113 <br />