Laserfiche WebLink
D PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN C9 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE �$ I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS N (Same as Facility Name or DBA) 3. <br /> S Ui f UQkJtX 11134c- <br /> BUSINESS SITEADDFESS 103. y 104. <br /> i " , ft ELIDA) <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'mstructions,or annually,whichever is more frequent Such work must be performed byqualified personnel.123 ccf§2632,2634,2638,26411 <br /> MONITORING EQUIPMENT IS SERVICED �y 1.ANNUALLY 99.OTHER(Specify): 490-30- <br /> Wl ❑ ( P �Y)= 490-36. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN X 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED490-4[23 CCR§2632,2634) <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that apply) <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 49x5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 ccR§2632,2634j <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY J§ b.LIQUID FILLED ❑ a PRESSURIZED ❑ &UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: C 490-7. MODEL#: ,/ L�-%,C"0 490-8. <br /> LEAK SENSOR MANUFACTURER: �"A /Q b O' ' 490-9. MODEL#(S): fi� S 3.� 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 190-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: a. . . . .2 c.OTHERc' 490-18. <br /> _ � 01 g.p.h. b0 <br /> � _ $�P•h.. ❑ (Specify): 0-90-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20. <br /> ........._._......_ . <br /> ❑ 4 WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 190 7.t. <br /> .._.. ....... _...._........ _.. 0-90-22. <br /> ...... _.......... ....-49 --._._. <br /> El 5.TANK INTEGRITY TESTING PER[23 CCR§264311 49x23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER490-24. <br /> _.. __..... (_SP��')�... a90-7.s. <br /> ❑ 99.OTHER(S ec' ): 490-26. <br /> 49427. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (h heack I <br /> 0 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [§26361 SECONDARY CONTAINMENT IS: N3 a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d_UNDER VACUUM 49429. <br /> PANEL MANUFACTURER: V F jQ&,4, 49430. MODEL#: �1 L 3 S0 490-31. <br /> E DS <br /> LEAK SENSOR MANUFACTURER: VEA b Y'" 490-32. MODEL#(S): RLI R 49433. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. Do a YES ❑ b.NO 49434. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN, log a.YES ❑ b.NO 490-35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S): YM 49437. MODEL#(S): �q GQ (� 49438. <br /> (� <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49443. <br /> 1-1.11 ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49444. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY 490-46. <br /> _.... ❑ b EVERY 3 YEARS ❑ a OTHER(SPcei__)... 0-90-0-7. <br /> ❑ 5.VISUAL PIPE MONITORING. 49448. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(6x3) <br /> El 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(0-x3)1 0-90-50. <br /> ❑ 7 NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ..... . .............. <br /> ❑ <br /> 99-OTHER(Specify) _._.494'2. <br /> 49453. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />