My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_1995-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 3:54:44 PM
Creation date
6/3/2020 9:45:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-1999
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_1995-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. New facility plan review fee of $624.00 (8 hour minimum per facility), $170.00 fee per <br />tank, plus $56.00 state surcharge fee per tank is due at time of plan submittal. <br />b. New installation of an additional tank at an existing facility is $624.00 plan review fee (8 <br />hour minimum per facility) plus $170.00 fee per new tank, and $56.00 per tank state <br />surcharge fee. <br />C. it should be noted that a $624.00 pian review check fee required for each submittal allows <br />for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br />plan review, meetings, inspections, phone or office consultations will be billed to the <br />applicant at a rate of $78.00 per hour. <br />d. The maximum review time for UST installation plans is 40 working days. A preliminary <br />review will be conducted by the PHS-EHD within 20 working days of submittal date to <br />identify any gross plan deficiencies. <br />e. If gross deficiencies are identified, the plans will be returned with a checklist identifying plan <br />deficiencies. <br />To expedite the review of installation plans, time and a half per hour overtime fee may be <br />submitted to have review completed within 10 working days of submittal date if staff is <br />available to perform the review. <br />a. The enclosed plan review sheet is to be completed and submitted with the three sets of <br />drawings to PHS-EHD . <br />b. A copy of the California UST Regulations may be obtained from the California State Water <br />Resources Control Board at (916) 227-4303. <br />C. Permits and/or plan check approval may also be required by the San Joaquin Valley Unified <br />Air Pollution Control District, the County/City Building Department and the Fire District in <br />your respective area. <br />d. A minimum of 3 inspections will be conducted on the UST system installation. A $78 per <br />hour inspection fee shall be charged for additional inspections or reinspection as required. <br />(See required inspections below) <br />e. Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br />reported to and approved by PHS-EHD prior to installation. <br />f. The application for installation of underground tanks is only valid for the calendar year in <br />which it has been issued. A permit may be extended into the next calendar year if a letter is <br />sent to PHS-EHD requesting this extension thirty days prior to the end of the calendar year. <br />A one time, one year extension may be granted by PHS-EHD upon receipt of this letter. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.