Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed lay: !:.l Stump Manufacturer ❑Industry Standard X Professional Engi w� <br /> neer <br /> 0 Other(Specify) <br /> ............. <br /> Test Method Used: D Pressure 0 Vacuum X Hydrostatic <br /> D Other(Spee) <br /> �! � =E: <br /> ' Sum .;#3 � � . #s <br /> Lest Equipment Used Caldwell Systems Equipment Resolution .005/30 min <br /> mp <br /> y <br /> Sum # l Sump <br /> Sump Diameter: 48" 48" 48" <br /> _..._ _ <br /> Sump Depth: 45" 46" 49" <br /> .............._.... <br /> _— <br /> 1 Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of <br /> 14" 13" 13> <br /> ' Ilighest Piping Penetration: <br /> Height from Tank Top to Lowest 16" 12" 14" <br /> t Electrical Penetration: <br /> _.__._.. <br /> Condition of sump prior to testing: Ivry Dry Dry <br /> ...... <br /> Portion of Sump Tested' 2"above Highest Piping Penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes i:a No n NA x Yes : ;No DNA x Yes D No DNA D Yes n No NA j <br /> product and water)`. I <br /> i Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes C'1 No f NA x Yes �1 No DNA x Yes DNo DNA 0 Yes 1� No DNA <br /> shutdown? _ <br /> Was fad-safe verified to be <br /> Yesx No ! NA ❑Yes x No 0 NA 0 Yes x No 0 NA 0 Yes !.]No l`!'NA <br /> 3 <br /> operational?* j <br /> Wait time between applying 1 <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test. <br /> I--- <br /> Test <br /> _Test Statt Time: d 9:3010:25 10:05 <br /> Initial Reading(111): 00" 00" .00" .00" <br /> Pest End Time: 10:00 10:55 10:35 <br /> Final Reading(RF): .00 —�� .00 _00 <br /> Test Duration: 30 rni.n 30 min ! 30 min 30 ruin <br /> Change in Reading(Rr-Rj): .00 ^� .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> 'lest Result: x Pass 0 Fail x Pass D Fail x Pass 0 Fail 0 Pass ❑Nail <br /> ._. <br /> z Was sensor removed for testing? x Yes D No DNA x Yes No 7NA x Yes D No DNA - Yes F.No NA ` <br /> r--- <br /> Was sensor properly replaced and <br /> x Yes U No a NA x Yes QNo iwl NA x Yes D No DNA Yes r rNo JNA <br /> w verified funcxionai after testin���u 1 <br /> Comments—(include infvrmauon un repaira made prior to testinK, and recommended follow-rep for failed tes(s) <br /> if the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />