Laserfiche WebLink
F <br /> San JoaquinCounty <br /> Environmental Health Department DIRECTOR <br /> O Donna Heran,REHS <br /> 600 East Main Street PROGRAM COORDINATORS <br /> , 4 tockton, California95202-3029Margaret Lagorio,REHS <br /> •'> " Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> f..: �� Website: www.S/gov.org1ehd F°a Phone: (209)468-3420 Kasey Foley,REHS <br /> Fax: (209)464-0138 <br /> January 6, 2010 <br /> Robert Barnhart <br /> Reliable Petroleum Services <br /> 521 Branding Iron St. <br /> Oakdale, CA 95361 <br /> Fax: (209) 845-8953 <br /> Re: Chevron, 8660 Lower Sacramento Road, Stockton, CA SR0058973 <br /> The San Joaquin County Environmental Health Department(EHD) has completed the review of <br /> the AMENDED application for a permit to conduct an EVR upgrade and 87 tank annular sensor <br /> replacement on the underground storage tank (UST)system at the above noted address. The <br /> permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Garrett Backus at(209)468-2986 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of <br /> permit approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. A copy of the alarm <br /> history shall be printed prior to performing the "cold start" of the Veeder Root system <br /> and made available at the time of EHD inspection. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval (EVR upgrade only). <br /> 4. If concrete will be broken near the UST or piping, a secondary containment test must be <br /> performed on the UST or piping once concrete is poured in accordance with the <br /> manufacturer's guidelines. <br /> 5. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br />