Laserfiche WebLink
F. In -Tank Ga ging / SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No" <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />o" <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />ection H, below, descr <br />_eak Detectors (LLD): <br />Complete the fol <br />be how and when these deficiencies were or will be corrected. <br />❑ Check this box if LLDs are not installed. <br />owingchecklist: <br />® <br />Yes <br />❑ <br />❑ <br />No` <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 g.p.h ; [10.2 g.p.h. <br />® <br />Yes <br />❑ <br />No` <br />Were all LI_Ds confirmed operational and accurate within regulatory requirements? <br />® <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />® <br />No` <br />N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />® <br />Yes <br />❑ <br />❑ <br />No* <br />wA <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® <br />Yes <br />❑ <br />❑ <br />o* <br />/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® <br />Yes <br />❑ <br />❑ <br />o* <br />/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® <br />Yes <br />❑ <br />❑ <br />o' <br />/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® <br />Yes <br />❑ <br />o" <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />-ction H, below, descri <br />Comments: ALL <br />a how and when these deficiencies were or will be corrected, <br />PLLD GOOD FIRST TRY <br />iitoring System Certifi ation Page 3 of 4 <br />2/21/07 <br />