My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:51:09 PM
Creation date
6/3/2020 9:45:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROt& STORAGE TANK MOORING PLAN <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />Mol, <br />PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />M01 <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />FACILITY NAME Lower Scramento Chevron <br />M03. <br />FACILITY SITE ADDRESS 8660 Lower Scramento Road M04 <br />CITY Stockton <br />M05. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed in <br />M06, <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99. OTHER (Specify): <br />MOT <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />line leak detector, monitoring system control panel, etc.). if you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />form, Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />MM <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />Mn. <br />PANEL MANUFACTURER: Veeder Root Mie. MODEL #: TLS -350 <br />M13, <br />LEAK SENSOR MANUFACTURER: Ueeder Root M14. MODEL #(S): TLS 350 <br />M15 <br />El 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: M16. MODEL #: <br />M17 <br />IN -TANK PROBE MANUFACTURER: MIB. MODEL #(S): <br />M19. <br />LEAK TEST FREQUENCY: ® a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. b. 0.2 h. ❑ c. OTHER (Specify): M22. <br />g.p.h. ® g.p.h. (� P TY)� <br />M23. <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24- <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />® 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ® a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): M26. <br />M27. <br />® 6. VISUAL MONITORING DONE: ® a. DAILY ❑ b. WEEKLY (Requires agency approval) <br />❑ 99. OTHER (Specify): <br />M28. <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />M30. <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />M31. <br />PANEL MANUFACTURER: Veeder Root M32 MODEL #: TLS 350 <br />M33. <br />LEAK SENSOR MANUFACTURER: Veeder Root M34. MODEL #(S): TLS 350 <br />M35. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ® a. YES ❑ b. NO <br />M36, <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO <br />M37. <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />MLLD MANUFACTURER(s): M38. MODEL #(S): <br />M39. <br />® 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER: Veeder Root Mao. MODEL #: TLS 350 <br />M41, <br />PROGRAMMED LINE INTEGRITY TESTS: E a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO <br />M44. <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: ® a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) M45. <br />M46. <br />❑ 5.VISUAL MONITORING DONE: ® a. DAILY ❑ b.WEEKLY* ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED" <br />M47. <br />*Requires agency approval '• Allowed for monitoring of unburied emergency generator fuel piping only per HSC §25281.5(b)(3) <br />El6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />Mas. <br />UN -022A -1/5 www.unidocs.org Rev. 10/14/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.