Laserfiche WebLink
IDUST Monitoring Site Plan 0 <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />...............{....................................... <br />. . . . . . . . . . . . <br />•. <br />. . . . . . . . . . <br />. <br />iQ�6J.S <br />. <br />. . . . . . . <br />. . . <br />. . . . . . . <br />. . . . . . . <br />. . . . <br />r/ . <br />,V%WN. oe S . . . . . <br />. . . . . . <br />. . . . . . . . . . . . . <br />. . . <br />. . . . . . . . .y <br />=.-'. <br />.04 <br />1 <br />. <br />�C�] <br />!!��S� <br />V. <br />. . . . <br />. . <br />•t !off <br />. . . . . . . . . . . . <br />. . . . . . . . . <br />. . . . . . . . . <br />. . . . . <br />i <br />, <br />. <br />. . . . . . . . . . . <br />-T-i* <br />to . . . . . . . . . . oL p <br />to <br />..................................................... <br />..;,,., yam. . . . . <br />Date map was drawn or revised: <br />Instructions <br />If you already have a diagram (e.g. your Hazardous Materials Business Plan Site Plan/Storage Map) which <br />shows all required information, you may include it, rather than this page, with this monitoring plan. On your <br />site plan, show the general layout of tanks and piping in relation to nearby buildings or other structures. Clearly <br />identify locations of the following equipment, if installed: monitoring system control panels; mechanical or <br />electronic line leak detectors; sensors monitoring tank annular spaces, sumps, trench systems, under -dispenser <br />containment, or other secondary containment areas; and, if ATG is required, in -tank liquid level probes. In the <br />space provided, note the date the drawing was prepared. <br />UN -022A - 5/5 www.unidoes.org Rev. 10/14/03 <br />