My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:51:09 PM
Creation date
6/3/2020 9:45:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />F. lop I-anic Gauging / SIR EgUI P eut: <br />Check this box if tank gauging is used only for inventory contaol. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perforin leak detection monitoring. <br />Complete the following; checklist: <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section II, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): this box if LLDs are not installed. <br />E <br />Camnlete the fnllaWina rh�.�.lrt:�t• /e% <br />Yes <br />❑ No* <br />For equipment start-up or annual equipment ertification, was a leak simulated to verify LLD performance? <br />13 N/A <br />(Check all that apply) Simulated leak rate: 3 g.p.h.; L30.1 g.p.h ; L30.2 g.p.h. <br />,Yes <br />L3No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />El No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine autom atically shut off if any portion of the monitoring system is disabled <br />13 N/A <br />or disconnected? <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ N/A <br />or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />❑ No* <br />❑ N/A <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Yes I <br />❑ No* <br />* In the Section <br />H_ <br />heinw_ apc...-aho 16n —A _1L__ <br />H. Comments: <br />v Xa U, W AN VC CVrrecleu. <br />1 <br />Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.