Laserfiche WebLink
Dec 29 06 02:16p <br />Lower Sac Chevron <br />VJ <br />2099540582 p.4 <br />It <br />IF <br />UNDERGROUND STORAGE TANK <br />moNrrORING P -- PAGE 2 <br />_r _ � , ;,t��. ' '. :'; YI,•TIZSP�'���'�.i)�il['i'�JRI�T�. . <br />MONITORING OF. AREAS BENEATH DISPEMER(S) iS USING THE FOLLOWM METHODS) (Check all Curt apply) Mo. <br />I _ CONTINUOUS ELECTRONIC MONITIQ G OF. UNDE�pD�iSPWER CONTAINMENT (UDC) .+ <br />`J 0 <br />PANEL MANUFACTUR19L `g - i2 dL-� _.7 M5t- MODEL 0: � � ± mtsa <br />LEAK SENSOR MANUFAC UREIL � c gn a'T Mss. MODEL li(Sx 3t'1-2- Msa. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ . s. YES ❑ h NO Mss, <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC. PUMP SHUTDOWN? ❑.. a. YES a. b. NO b"6 - <br />WILL FAILUREIDISCOINNECTION OF. UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? [3, a. YES [3, b NO M'7 <br />❑ 7- MECHANICAL ASSEMBLY (e g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS. SHEAR VALVE IN CASE OF. LEAK <br />ASSEMBLY MANUFACTURER: MODEL #(S): W9 - <br />1Y [ 3.VISUAL MONITORING DONE: a. DAILY ❑ b. WEEKLY of q -i. tubo. <br />0. 4. NO DISPENSERS <br />❑ 99.OTHER(Specify) 1hr61. <br />VJEy -ENHANCER LEAK DETE ON <br />❑ .1. WE HAVE BEEN NOrTIFW BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST ZHUMENT ENIiANCED LEAK M'a <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN -PEP. CCR ¢2644.1, ELD IS PERFORMED EVERY. 36. MONTHS. AS. REQUIRED <br />7777 7-7 <br />RlWERENCE DQCUhiI NTS MAINTAINED AT FACILITY (C11ec1c ail that apply) ssao. <br />I. M THIS-UNDERGROUNDSTORAGE TAM MONITORING PLAN (Rcquired) <br />2. OPERATING MANUALS FOR F.t.ECTROMC MONITORING: EQUIPMENT (Required) <br />3. THE FACILITY'S BEET MANAGEMENT PRACTICES (Required as of l/il VM05) <br />4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. CALIFORNIA UNDERGROUND. STORAGE TANK LAW <br />6. STATE WATER RESOURCES. CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICALD VENTORYRECONCB.IATKW <br />7. ❑ SWRCB. PUBLICATION; "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND. STORAGE TANKS" <br />43. ❑ OTHER.(Specify)- Mal. <br />Petsouncl with UST monitoring responsibilities are fimiliatwith all ofthe above documents relevant to their job duties and can access dxm documents when needed_ <br />By Iammary. 1, 2045 this facility will have a "Designated UST who has passed the operator exam administered by the International. Code CouncR (ICC). By <br />Jammy 1, 2005, and annually thereafEear, the . d UST Operator" wig train facility employees in the proper operation and minatenance of the UST. systems. <br />This training wilt include, but is not limited to, the following. <br />D Operation of the UST systems in a manim consistent with the fkAty's best management practices. <br />A The dilly employee's rale with regard to the leak dowetiml equipment <br />P- The f acuity employee's role with regard to spills and overfills. <br />Whom to contact for emergencies and leak dates ion alarms. <br />For facility employees hired on or. after January 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX.. CIC r*RVM?ffSIADDIMONAI ,,WO TION . r <br />Pleasm: use this Manion to educe any additional UST system monitoring -related infomauttion (eg., additional 'information required by your local agency): arse. <br />-t <br />tiU� ('r10 <br />77. <br />..:PERSONNM- RESPONSIBILITIES. <br />AS OF 1/1105, THE "DESIGNATED UST OPERATOR . IDENTIFIED. IN SECTION III OF THE CURRENT.UST OPERATING PERMIT APPLICATION - <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY. FOR PERFORMING THE MONITORING ACTIV ES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED. BY THIS PLAN, AND WILL PERFORM AND. DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS.IN ACCORDANCE WITH 23. CCR §. 27l <br />= )a- 0NVNE1RL0P TOR $IGNA'I`UW <br />CERTMCATIOdN: I certify *At tke. trf a ■ provided herein is true and accurate to the best of my know e. <br />OWNER1t:)PERATOR SIGNATUREDATE: <br />Owner t.�a. <br />t. <br />t 2 <br />Mt- t Operator <br />OWNER/OPERATOR NAME (print): M9Z <br />OWNER/OPERATOR TITLE: ` <br />1 t -N Iz moi_ - <br />U 03 <br />Mg—y Ure Only) 'Chis plan has been reviewed and: ❑ Approved Q Apprroved With Conditions [) Disapproved <br />Lucid d Amy Sigrladue: Date: <br />Commen&Special Conditions:. <br />SdCEHD-d (07/03) -314 07)2m <br />