My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:51:09 PM
Creation date
6/3/2020 9:45:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arrestation No P 02 <br />Chris Steadman <br />Wendt Construction <br />Atteaded latmUstion Traiaiall for EVR Phase 1 by pt:Y, Irrc. <br />gy David Hoes On <br />In A Exp Date: 3/30/2006 <br />iof 04 rA coon dM OW OVA* 0 wa�N a A�'t1' �►' �' d <br />pow dnw-* —Owya rar9rvo <br />I r>+a cwaar dotW &V wqe Me med to rtnYeb aON V a <br />rrr WWMK%ftV MrpMy a"a rwseMtM+✓nQ naukq <br />and RwR prwld ! . AN Odea ro *MW'r` <br />arM ew / awry Oe ad MRWMed to ftw Mr wrm <br />awl, <br />Attestation No. P 02556 <br />3 0 Don Gilmer <br />Wendt Construction <br />Attended Installation "training for EVR Phase t by OPN', Inc. <br />By Dave Haas On 3/28/2005 <br />In Lodi, CA Exp Date: 3/28/2006 <br />completion of this training course does not create a warranty or guaranty by OPW of <br />your installation and/or maintenance of nozzles, vapor recovery systems and EVR <br />PHASE I systems. This training course does not eliminate the need to strictly adhere to <br />manufacturer instructions and procedures when installing and maintaining nozzles, <br />vapor recovery systems and EVR PHASE I Systems. All nozzles, vapor recovery systems <br />and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. <br />Attestation No. P 02557 <br />Ernesto Ramrez <br />Wendt Construction <br />Attended Installation Training for EVR Phase t by OPW, Inc. <br />By Dave /leas On 3/28/2005 <br />In Lodi, CA Exp Date: 3/28/2006 <br />(' Limoletion of this training course does not create a warranty or guaranty by oPW o/ <br />Your installation and/or maintenance of nozzles, vapor recovery systems arra EVR <br />PHASE I systems This training course does not eliminate the need to strictly adhere to <br />manufacturer instructions and procedures when installing and maintaining nozzles <br />vapor recovery systems and EVR PHASE I Syslems. A# nozzles, vapor <br />and EVR PHASE I Systems must be installed and maintained in accordancerecovery withsystems <br />manufacturer instructions and orccx/ures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.