My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:51:09 PM
Creation date
6/3/2020 9:45:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231161_8660 LOWER SACRAMENTO_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />1 <br />INA 44m <br />A <:fel' *' <br />WRITTEN MONITORING AND RESPONSE PLAN <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all rimes. The information on this monitoring program are <br />conditions of the operating permit. The permit holder must notify Environmental Health Department, (209) 468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a permit before making <br />the change. Required by CCR 2632 (d) and 2641 (h). <br />FACILITY NAME I - <br />FACILITY ADDRESS, <br />DATE 1/d/0 <br />/® <br />1.Name(s) and .Title(s) of the people responsible for performing the monitoring and/or maintenance <br />'f,J lei A.) 119 <br />r� <br />2.Describe the frequency of performing the monitoring for: <br />TANKS <br />PIPING &,R.Tf> <br />�/io5 f7"Tt�z. ,1 — <br />3.Describe the location(s) of where the monitoring will be performed. ie: location of sensors <br />4.Describe the following equipment for each underground storage tank. <br />Name and Model of Monitoring Panel V1-4- <br />Name and Model of Line Leak Detectors <br />Name and Model of Annular Sensors 1� Q <br />Name and Model of Piping Sensors 749 4 3 q C3 r 2 v 5 <br />Name and Model of Dispenser Sensors -7 C1 `i 3<)U <br />Type of overfill prevention ?VZC1%/�eu't+' <br />A*, <br />S.Do the Ttibine Sensors and Dispenser ran Sensors shut down the turbine? Ye�,k No 0 , <br />Does the turbine shut down if a sensor is disconnected? YesYesM No 0 <br />No 0 <br />Does the turbine shut down is the monitoring panel loses power? <br />6. How will the alarm history and subsequent maintenance be recorded? <br />7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and rec rding for the monitoring equipment. What month will <br />annual monitoring certification be performed in? <br />Note: For new installations the secondary containment must be tested 6 months after installation. All secondary containment systems <br />must be tested once every 36 months with initial testing performed before January t,1003. <br />8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />equipment. ���9 tYJ�Nf1/a'f,, /, �T� ifhit2 <br />ItEL 11 <br />I.\Unit III\UST%monitoringplan.doc <br />5/302002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.