Laserfiche WebLink
Test Date : 17 Mar 1993 Work Order# : 9 6 0 8 2 5 <br />ULLAGE TESTING DATA <br />11 <br />Tank 1 <br />Tank 2 Tank 3 <br />Tank 4 Tank 5 Tank 6 <br />Product: <br />SUPER <br />UNLEADED DIESEL <br />True Capacity -gal: <br />12,000 <br />12,000 12,000 <br />Ullage volume -gal: <br />5,668 <br />4,612 4,353 <br />Fluid pressure <br />on tank bottom(psi): <br />1.25 <br />1.40 1.70 <br />Ullage test pressure: <br />2.75 <br />2.60 2.30 <br />Stabilization time: <br />25 <br />20 20 <br />Fill start time: <br />12:00 <br />12:00 12:00 <br />Time to 1 PSI: <br />8 <br />8 6 <br />Time to test pressure: <br />4 <br />4 4 <br />Start time - test 1: <br />12:37 <br />12:32 12:30 <br />Nitrogen flow (cfh): <br />0.20 <br />0.20 0.20 <br />Ullage temperature -F: <br />60.6 <br />59.2 60.3 <br />Finish time - test 1: <br />12:47 <br />12:42 12:40 <br />Nitrogen flow (cfh): <br />0.20 <br />0.23 0.00 <br />Start time - test 2: <br />12:50 <br />12:44 12:42 <br />Nitrogen flow (cfh): <br />0.20 <br />0.20 0.20 <br />Ullage temperature: <br />60.5 <br />58.9 60.4 <br />Finish time - test 2: <br />13:00 <br />12:54 12:52 <br />Nitrogen flow (cfh): <br />0.10 <br />0.10 0.00 <br />Start time - test 3: <br />13:02 <br />12:55 12:55 <br />Nitrogen flow (cfh): <br />0.20 <br />0.20 0.20 <br />Ullage temperature -F: <br />60.5 <br />58.9 60.4 <br />Finish time - test 3: <br />13:12 <br />13:05 13:05 <br />Nitrogen Flow (cfh): <br />0.10 <br />0.10 0.00 <br />Pass/Fail: <br />PASS <br />PASS PASS <br />ULLAGE TEST COMMENTS: <br />NOTE: [ 2 consecutive test e < 0.275 constitute a PASS ] [ 3 consecutive test ® > 0.275 constitute a FAIL ] <br />NDE Environmental Corporation - 20000 Mariner Avenue Ste 500 - Torrance, CA. 90503 - (310) 542-4342 Page 2 <br />