Laserfiche WebLink
CAPACITY 12000 9 PRECISION UNDERGROUND TANK TESTING RESULTS Patent Pending <br />TANK * Super Unleaded PAGE 5 <br />STAT * 5886 TEST PROCEDURES <br />TEST DATE: 02/27/90 Copyright 1985 <br />NDR TECHNOLOGY, INC. PROPRIETARY <br />1. Piping Pressure Test - NO <br />2. Pneumatic Pressure Data <br />Amount of pressure applied <br />to system: N/A <br />3. Amount of pressure drop if any: N/A <br />4. Amount of time elapsed during the test. N/A <br />5. Piping Pressure Test Leak Rate is N/A <br />If computer is used see computer- printout of leakage rate and all <br />test parameters on Test Results, Part TV, Page 11, 12 <br />Test results of storage systems that: utilize pressurized piping <br />systems will not be recognized unless the turbine pump is <br />activated after the completion of a successful system test <br />6. Was turbine pump activated? NIA <br />7. Pressure piping systems shall be tested under actual operating <br />pressures, and statement describing results must be included. <br />See *1 Above <br />B. If applicable, has the isolation procedure in addition to the <br />product line been completed? N/A <br />NDF TECHNOLOGY, INC. PROPRIETARY <br />WATT INC. 3131 FAIRHAVEN DRIVE, BAKERSFIELD, CA 93308 (805) 322-9827 <br />