My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_1986-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 12:58:18 PM
Creation date
6/3/2020 9:45:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1994
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_1986-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE PREPAF A 'ION AND SYSTEM DATA Pap •3-5 <br />CHECK TANK SYSTEM SIZE t •TANK U 2 - TANK 3 -TANK <br />CUSTOMER: �/�i/d Gl4 L <br />DATE: <br />LOCATION NO.: <br />SYSTEM NO.: <br />CITY/STATE: STDGKT®�(f 'G� <br />PRODUCT: <br />SITE PREPARATION <br />OTHER CONDITIONS <br />VAPOR RECOVERY ❑ PLy_.�r�5 ed RISERS OTHER <br />VENT ryo PREPARATION CJ OPEN TO ATMOSPHERE ❑ P. <br />V VALUE REMOVED ❑ OTHER <br />❑ REMOTE/SUBMERSIBLE (DEPTH ) ❑ SUCTION (HEIGHT <br />CHECK VALVE ) <br />STRAINER IMPACT VALVE+, CHECK VALVE STRAINER <br />_ "SUCTION CONNECTION <br />❑ REMOVED & OPEN ❑ REMOVED PLUG-IN ❑BUR E1 O~ ❑ REMOVED <br />�(/ �/ ❑UNION <br />EJ I�N PLACE 3 -IN PLACE ❑PLUG OUT ❑EXTRACTABLE t <br />uCLOSED ❑ REMOVEp &COVER ❑OPEN SCE ❑COUPLING <br />REPLACED ❑ REMOVED REMOVE COVER ❑OPEN,WITH FOIL <br />REPLACED <br />❑ <br />REMOVED ®OTHER Cl IN PLACE <br />❑OTHER OPEN NO FOIL <br />❑ OTHER ❑CAP REPLACED <br />❑ IN <br />CE. <br />❑ OTHER ❑OTHER <br />--------------- <br />TEST 1 DATA <br />TANK t TANK 2 <br />LOCATION DROP TUBE TANK 3 <br />LOCATION DROP TUBE LOCATION DROP TUBE <br />FILL Gaugo Other (Specify) IN OUT None FILL Gau o—(SpKity)`'IN OUT Noll FIL "Gauge Other (Specify) IN OUT one <br />T. PROBE <br />BALANCE <br />CALIBRATION <br />WLEVELSLOCATION METHOD (�,/' <br />I SOLID ROD <br />❑ LIQUID <br />t 2 3STARTCC'S D�a6AVERAGE <br />ENO � DIVISION �y � � /�' �?, � /�. ✓ �9' 3 �/' ?r <br />AVG. CC'S/DIV. / <br />LE ULATI <br />LR - f� DIVISIONS X CALIBRATION, CC CC <br />OMINUTE DIVISION s MINUTE (N OUT <br />TEMPERATURE COMPENSATION (TC) CALCULATION <br />COEFFICIENT OF; EXPANSION 1/'F <br />GRAVITY TEMPERATURE, F TC = 3785GT CE A7F CC r 114 OUT <br />SOURCE ❑ T159C TIME MINUTE OR (_ ) <br />❑ A ❑ D ❑ CHART a,, <br />a <br />C 0 E 13 PUBLISHED DATA AT 60OF °' <br />❑OTHER r . <br />TC <br />TANK 1 TANK 2 TANK 3 � 0,5_ <br />` <br />SYSTEM CAPACITY, <br />GALLONS GT <br />ap TANK 1 TANK 2 TANK 3 - TOTAL <br />t Temp. Differential f . ° F TC. <br />T Time of Temp: <br />)Ifferenttat, Min. Time <br />ABSOLUTE LEAK RATE IALR) CALCULATION <br />ABSOLUTE LEAK RATE _ '- D3 — �L 2, Dsr� n _GQ <br />LEAK RATE TEMP.COM,ENSATIO,N� ® CC�/MINI <br />X 0.015852 • t /'� <br />C C/MIN GAL/HOU R <br />❑ IF ALR i f 0.05 GPH, A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS (CALCULATIONS ON CHART) <br />s <br />❑ A CHECK TEST WAS NOT CONDUCTED. <br />° 60 MINUTES/HOUR 3785 CC/GALLON • 0.015852 <br />
The URL can be used to link to this page
Your browser does not support the video tag.