Laserfiche WebLink
t � a <br />Y SYSTEM PRINTSET INFORMATION <br />Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br />Plans drawn to scale in non -erasable print. <br />kPlot plan to show location and number of tanks. <br />iZ Tank cross-sectional diagram included on prints submitted. <br />Detail of tank, piping system, excavation and cover, <br />1i Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br />Article 3, Sec. 2631 (r) & 26351 <br />2LVerification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br />Manufacturer s written installatnon instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)) <br />t, fit' Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br />[Section 2635 (b) (6) & (7)] <br />10. 4A. Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br />11: I NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br />be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)l <br />13. TANK(s) TO BE INSTALLED N 1 A <br />_ A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)7 <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. <br />(3) Installation instructions require an air test and soap bubble test prior to installation. <br />Non -clad steel tank [Section 2635 (b)] <br />_ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br />4 <br />TANK # # <br />i <br /># 2 # 3 # <br /># <br />CAPACITY lZcxzx=� <br />) 2.000 1z000 <br />MANUFACTURER <br />COMPOSITION!' c>ts <br />MODEL S nV T <br />PRODUCT <br />CORROSION PROTECTION vloil'�c3i5 <br />U.L. LISTED Yes <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE INSTALLED N 1 A <br />_ A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)7 <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. <br />(3) Installation instructions require an air test and soap bubble test prior to installation. <br />Non -clad steel tank [Section 2635 (b)] <br />_ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br />4 <br />