My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 4:11:26 AM
Creation date
6/3/2020 9:45:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br />,.1GG.LL. o � GA <br />Project Location Z'10 ► �. M -� :)Z:z <br />Owner tot�?2o ra L."f-s c,orylP.c>rJ �( c�yn1 a G.� L. Phone No. <br />Contractor VA L,.; 2-4,1t.A Phone No. go �) 3 Z8 l 1 License No. ? 4 <br />INDICATE m=OD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineers Compaction Report within 30 days of project completion, or <br />2 Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br />was placed in the excavation M I2 lifts: <br />?c A. Pea ;ravel—smooth, rounded material not snore than one-half (1/2) inch in diameter <br />uarers <br />.e B. Crushed rock—self-compacting (Use crusherock will not be permitted for not more than backfill f c(o3ntact will be made between <br />inch in cross sectional <br />measurem <br />the backfill material and tanks/pipes made of poly resin ;lass or similar materials.) <br />DECLARATION <br />I herebv certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pr cubic yards completion. <br />o submission <br />of verincation that the select material described above will be placed at a minimum of five (5) per <br />tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br />Code Appendix Chapter 70. <br />0 <br />• Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.