My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 4:11:26 AM
Creation date
6/3/2020 9:45:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I.VRRVlBYn rnVIGLa - - - <br />USY SYSTEM PRiNTSET <br />INFORMATION <br />1. <br />Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br />Z, % <br />Plans drawn to scale in ten -erasable print. <br />3. <br />Plot plan to show location and number of tanks. <br />4. <br />Tank cross-sectional diagram included an prints submitted. <br />5. <br />Detail of tank, piping system, excavation and cover. <br />6. <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subehapter 16, <br />Article 3, Sec. 2631 (r) & 26351 <br />7. is <br />Verification of product compatibitity with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br />3. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br />9. <br />Tightness Test (NFPA 30) is required an both primary (10) and secondary (20) containment systema; before covering. <br />[Section 2635 (b) (6) & (7)] <br />10. id <br />Double walled tanks rasing pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br />11, is <br />NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br />be submitted directly to PNS/EHD from the testing company or owner of facility. tNealth & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)] <br />12. TANK CON POS ITION <br />TANK # <br /># j # 2, # # # <br />CAPACITY] <br />,ono i % Ooo 15 Oo0 <br />MANUFACTURER <br />ml, o o E <br />J oco- <br />COMPOSITION <br />MODEL <br />PRODUCT <br />nnnxrrenu %rJ f"�LA <br />I.VRRVlBYn rnVIGLa - - - <br />U.L. LISTED y s Ye s <br />COMPATIBILITY WITH 100% YES Yi�'S YE'S <br />METHANOL <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (03 <br />N IA C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimmensions and materials. <br />(2) Striker plate under all accessible openings. <br />(3) Installation instructions require an air test and soap bubble test prior to installation. <br />NIA D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimmmammsemi-annual inspection requirement). <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.