My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 4:11:26 AM
Creation date
6/3/2020 9:45:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_1995.tif
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br />Ln <br />b. Tank/Piping Hauler. <br />Name <br />Address ZS t�.3+r'✓ t� <br />1 W=4_. City �icl...,-.o..d zip <br />Phone No.( ro ) 2-3'9 - 1 <br />Hanler Reg6jraflon # (if hauled as hazardous) O i <br />C. Tank/Piping Disposal Site: <br />Name <br />Address Pa.r'r (?.-I City r,-„�-�or�J Zip Gi `-e & o t <br />Phone No.( 5 t o ) ? 3 St 3 3 <br />EPA ID# (if transported to a permitted TSD facility) Ci 2 <br />9. Describe. in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />10. <br />Describe how the excavation will be backfilled with suitable material upon removal: <br />11. Handling of excavated soil: <br />a) What material will be used to lane the tank pit and cover the stockpile? <br />VI S"P�V-'% <br />b) What will be the final destination of the excavated stockpile? <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name So,r-�s ��r-� c..l�-. �_ <br />Hauler Registration # 2 fg A3 <br />8 $� I�r (`°1'o e 1G.- 1 City �c3c�✓C 3rr.�^ i— Zip Cis fe 2$ <br />Address �+ � <br />Phone No. ( Olt a ) 3 21 t—" Lo” <br />Page 5 <br />in <br />
The URL can be used to link to this page
Your browser does not support the video tag.