My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 4:11:26 AM
Creation date
6/3/2020 9:45:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC tEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Ernest M. Fujimoto, M.D., M.P.H., Acting Health Ofhcer <br /> 445 N. San Joaquin Street e P.O. Box 388 e Stockton, CA 95201-0388 <br /> (209) 468-3420 RECEIVED <br /> TO: INST AND OWNERS OF NEW UNDERGROUNAWALAINKS <br /> INVIRONMOTAL HgAhTH <br /> San Joaquin County Public Health Services-Environmental HealthWWWR as established the <br /> following guidelines to assist you in the completion of your construction projectMabAidelines specify the <br /> construction and monitoring criteria necessary to complete our review of your proposed underground storage <br /> tank (UST) system. <br /> 1. SUBMITTAL OF PLANS <br /> a. Submit 3 complete sets of detailed drawings in non-erasable print to the Environmental <br /> Health Division. Upon approval,one set will be retained by the department and the other <br /> two will be returned. <br /> b. Include equipment and material specification sheets and manufacturer's brochures describing <br /> operating and monitoring systems and listing numbers or other evidence of a nationally <br /> recognized testing organization approval. <br /> C. Include detailed monitoring and response plans for facility. <br /> d. The drawn to scale plot plan should illustrate the location of all existing and proposed <br /> structures, including existing UST(s). <br /> e. The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from subgrade to finish grade. <br /> 2. PLAN REVIEW AND OPERATING PERMIT FEES <br /> a. New facility plan review fee of$624.00 (8 hour minimum per facility), $170.00 fee per tank <br /> plus.$56.00 state surcharge fee per tank is due at time of plan submittal. 4 Ali n;4-7& <br /> b. New installation of additional tank at an existing facility is $624.00 plan review fee (8 hour <br /> minimum per facility)plus$170.00 fee per new tank,and$56.00 per tank state surcharge fee. <br /> C. It should be noted that a $624.00 plan review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of$78.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS/EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with checklist identifying plan <br /> deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date. <br /> A Di%i%ion of'San Joaquin Count.k Health Carc Semite, <br />
The URL can be used to link to this page
Your browser does not support the video tag.