My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 4:11:26 AM
Creation date
6/3/2020 9:45:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UlbNSTALLATION INSPECTION RI-AlbunD <br /> FACILITY : V� • L Ga '� : 2®101 V/> Lr1 <br /> SWEEPS* TANO ULS TANK MCOELIMATERIAL: S <br /> CAPACITY: ►� l _ R.E.H.S: <br /> A I <br /> P N ALL TMKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> O I <br /> V A <br /> E L <br /> 0 S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PIANSSUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) CB) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 CE) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY AIHOLIDAY: <br /> V SOAP: PSI: MRS/HIM: BRIMEMIQUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: HRSMIN: <br /> 5. TANK APPRMIATELY PLACED WITH APPROVED RACKFILL (CCR 2635 CA) (3) (4) C6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2635 (8) (4)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: MRSMIN: OTHER: (CCR 2635 (A) CO) <br /> 8_ LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) MRS: CCCR 2635 (A)) <br /> 9. tNJSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) CO) <br /> 11. ALL PIPING AND FITTINGS CORROSION PRCrrECTED CCCR 2635 (8)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR HALL" MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFORMANCE TEST OF CONTINUCUS MONITORING SYSTEM (PANEL) CCCR 2632 (A) (2)) <br /> 14. PERF CE TEST OF LIME LEAK DETECTION (CCR 2632 CD) 2635 (B) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (8) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (8) (6)) <br /> 17. OVERFILL PROTECTION INSTALLED/ (CCR 2635 (E) (2)) <br /> 18. TANK ACCESS PORTS BROUGHT TO GRADE (L WATERTIGHT) (CCR 2631 (D) (5)) <br /> 19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 CA) C5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG BOCK ON SITE CCCR 2632 (E) Cl) C2)) <br /> 21. "C® FORK COMPLETED AND SLAINITTED CCCR 2635 (E)) <br /> 22_ MONITORING METHOD FOR ALL TAMKS AND PIPING APPROVED CCCR 2641-2644) <br /> 23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) CF)) <br /> CCM HENTS. <br /> EH2 006 3/92 (REVISED 11\92) <br />
The URL can be used to link to this page
Your browser does not support the video tag.