My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_1996-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:54:32 PM
Creation date
6/3/2020 9:45:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2003
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_1996-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ppoe Underground Storage Tank Monitoring Program <br /> 1. Operator/Site Number: DARRELL EPPLER Cost Center#255886 RE#31010 <br /> 2. Site Address and Phone Number: 2701 W MARCH LN STOCKTON, CA 952070000 ph. (209)473-7337 <br /> Inosco <br /> 4. Frequencv of Monitoring Method and location Where Monitoring will be Performed: <br /> Tanks: Tank(s)01 02 03 are monitored continuously using an electronic probe in the interstitial space of the tank. <br /> Piping: Pipe(s)01 02 03 have tightness tests performed annually capable of detecting a 0.1 gallon per hour release. Pipe(s)01 02 03 are monitored by a liquid-detecting probe <br /> located in the turbine sump. <br /> Dispenser: Dispenser pans are equipped with continuous mechanical monitoring/mechanical shut-off device. <br /> — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> 5. Name(s)and title(s)of the person(s) responsible for performing the monitoring and/or maintaining the equipment: <br /> Operator Name and Number: DARRELL EPPLER - (209)473-7337 <br /> Maintenance: TOSCO Service Contact Center - 1-800-726-2312 <br /> — — <br /> 6. Re—portin— —g—Form— —at:— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> The monitor will be certified annually and a report generated and provided to the operator. The operator is to report all audible or visual alarm conditions that may indicate a potential release to <br /> the TOSCO Field Representative or District Manager as well as the responsible party for maintenance,listed under#5. In the event of a test failure,the specific piece(s)of equipment are taken <br /> out of service and proper reporting procedures followed. The operator is to report all suspected releases to the TOSCO Field Representative or District Manager,as well as the responsible party <br /> for maintenance listed under#5. <br /> 7.—Sta—t—the—r—v—nt—tiv—e—Ma—int—ena—c—S—h—d—le—fo— — M—n—or—in—g Equ—ipme—nt:— — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> As recommended by the Manufacturer,the electronic monitoring system is certified annually by a third-party contractor. Repairs are made by the responsible listed under#5 upon notification by <br /> the station operator. The station operator is responsible for maintaining copies of testing results and repair records on site and available for agency inspectors. The 3rd-party testing <br /> requirements and frequencies for the tank system are summarized below. <br /> Contractor Tank Tightness Testing Requirements/Frequency Line and Other UST System Testing Requirements/Frequency <br /> Contractor testing of the primary tank is not required. <br /> Mechanical leak detector(s)tested annually. <br /> Piping 01 02 03 are tested annually. <br /> The tank secondary containment is tested per manufacturer's specifcations <br /> every 3 years in accordance with CCR Title 23 Section 2637. Secondary containment testing for piping,turbine sumps and dispenser pans is <br /> conducted every 3 years per manufacturer's specification under CCR Title 23. <br /> — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> 8. Describe the Training Needed for the Operation of Both the Tank System and the Monitoring Equipment: <br /> The operator has been trained to check the tank system and/or monitor daily for proper operation. If the tank system and/or monitor is not functioning correctly,the operator has been instructed <br /> to contact the responsible party for Maintenance listed under item#5 for repairs. <br /> — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> 9. Summary of Site Operator Requirements: <br /> For double wall tanks monitored by interstitial probes,the monitoring equipment must be continously operational with probes in place. Report all non-inventory monitoring alarms to the <br /> specified maintenance company and keep a record of alarms and repair work performed. All sites are responsible for maintaining daily and monthly inventory reconciliation records and <br /> notifying the TOSCO Field Representative or District Manager and Regional Environmental Compliance Specialist for inventory variances greater than the regulatory limit. <br /> 255886/31010 DARRELL EPPLER,2701 W MARCH LN, STOCKTON,CA 952070000 Date Printed: 07/03/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.