My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:06:45 PM
Creation date
6/3/2020 9:46:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB; January 2002 <br />Page 3 . <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: El <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer �x <br />Industry Standard F� Professional Engineer <br />El Other (Sped) <br />Test Method Used: <br />❑ Pressure <br />Vacuum Hydrostatic <br />El Other (Spec) <br />Test Equipment Used: WATER/GAS, TAPE MEASURE, STOP WATCH <br />Equipment Resolution: <br />Spill Box # 3 DIE FILL Spill Box # <br />Spill Box # <br />Spill Box # <br />Bucket Diameter: <br />11.00 <br />Bucket Depth: <br />13.00 <br />Wait time between applying <br />pressure/vacuum/water and <br />5 MIN <br />starting test: <br />Test Start Time: <br />0900 <br />Initial Reading (Ri ): <br />11.00 <br />Test End Time: <br />1000 <br />Final Reading (RF ): <br />11.00 <br />Test Duration: <br />1 HR <br />Change in Reading (R F - RI) <br />0.00 <br />Pass/Fail Threshold or <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.