Laserfiche WebLink
80' d _idloi RECENED <br />JAN 0 2 2014 <br />7. UNDER -DISPENSER CONTAINMENT TESIf V!RONMENTAL <br />C :Q I Qr-PARxA494T__ <br />Test Method Developed By: 0 UDC Manufacturer 0 industry Standard [3 Pro 1'0'nif_6ji-tnir' <br />[3 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic <br />[3 Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: 0.00211 <br />0C # 9/10 UDC # 11/12 <br />UDC Manufacturer: <br />Bravo <br />Bmvo <br />UDC Material: <br />steel <br />Stcel ---- ------- <br />UDC Depth. <br />1291 <br />Height from UDC Bottom to Top <br />of Highest PipiMPenetration: � <br />Located on Bottom <br />Located on Bottom <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Located on Bottom <br />Located on Bottom <br />Condition of UDC prior to <br />testim <br />Good <br />Good <br />Portion of UDC Tested <br />211 above piping <br />2" above pipiq& <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)f <br />U Yes [3 No 0 NA <br />0 Yes 0 No UNA <br />Turbine shutdown resp2nse time <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?* <br />El Yes [3 No 0 NA <br />Ej Yes E] No ®NA <br />Was fail-safe verified to be <br />ogerational?, <br />[3 Yes [3 No 0 NA <br />El Yes 0 No ®NA <br />Wait time between applying <br />pressuWvacuum/water and <br />starting test <br />30 minutes <br />30 minutes <br />Test Start Time: <br />1:00 pm <br />1:00 Rm <br />Initial Reading (Rj): <br />1,4866 <br />3.2439 <br />Test End Time: <br />1:15 ptn <br />1: 15 pm <br />Final Reading (Rp): <br />1.4863 <br />3.2436 <br />Test Duration: <br />15 min. <br />15 min, <br />-Change in Read" (&-R,): <br />0.0003 <br />0.0003 <br />Pass/Fail Threshold or Criteria, <br />0.002" <br />+/-0.002" <br />Test Result: <br />[KI Pass 0 Fail <br />0 Pass 11 Fail <br />Was sensor removed for testing? <br />[3 Yes 0 No C9 NA <br />0 Yes El No 0 NA <br />Was sensor properly replaced and <br />verified functional after te Z? <br />U Yes U No 0 NA <br />El Yes [3 No to NA <br />Comments — (include information on repairs madeerior Lotestin , and recommended follow -VL <br />orfailed tests <br />"Sensor fu - netionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />8. 1 ----------- — <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or 'INA", the entire UDC must be tested. (See SWRCB LG -160) <br />SO'd 8888 826 80t7 SWal-SRS UOTI-SI-S a31AJaS LZ :SZ VT0Z-E0-NUf <br />