Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES® NOM <br />2, Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan' is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements, if repairing a component, describe how this will be done. (if <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST installation Application <br />pages 4-8 as necessary for a timely plan review): <br />cold start monitoring system due to continuing warm start error (and dead battery) <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />none <br />