Laserfiche WebLink
'o�qulh•c <br />-.EE'•.oG <br />Q •� <br />���FORa <br />SAN JOAQUIN COUNTY • <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />V -f <br />❑ mechanical Model: <br />Facility Address: <br />i <br />Service Request #: <br />❑ <br />Leak detector <br />❑ <br />Onsite Service Technician's Name: <br />I C Service Technician/Installer Exp. Date: <br />Mandfacturer Training: <br />,4--, <br />3 i <br />❑ <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />i <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at95% <br />F-1 <br />Droptube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />SERVICE <br />> <br />Spill bucket rlinimum 5 gallon <br />--hour <br />-R9hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />i <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />Received By: <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />EHD 42.9[ r r �+ \ UST SERVICE REQUEST INSPECTION REPORT <br />Rev 10/06/1: <br />\I <br />I <br />i <br />T A ILIT iS SUBJECT TO REINSPECTIO At ANY TIME AT END'S CURRENT HOURLY RATE. <br />EHD pe <br />Received By: <br />Title: <br />EHD 42.9[ r r �+ \ UST SERVICE REQUEST INSPECTION REPORT <br />Rev 10/06/1: <br />