Laserfiche WebLink
APR -26-2012 09:19 S rice Station Systems 408 938 8888 P.05 <br />Monitoring System Certification - Page 3 of 3 <br />Site Address: 2704 March Ln. Date of Testing/Servicing: 3129/42_ <br />F. In - Tank Gaming / SYR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />a Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />a.van tor` <br />0 Yes <br />� <br />❑ No* <br />- <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />D Yes <br />0 No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />0 No's <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLD's are not installed- <br />vvua <br />dl Yes <br />❑ No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />O N/A <br />(Check all that apply) Simulated leak rate: a 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); 0 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />N Yes <br />❑ No* <br />]atory requirements? <br />Were all LLD's confirmed =rational and accurate within regu <br />Yes <br />13 No* <br />Was the testing apparatus properly calibrated? <br />0 Yes <br />❑ No* <br />For mechanical LLD's, docs the LLD restrict product flow if it detects a leak? <br />0 N/A <br />0 Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />a N/A <br />0 Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />0 N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />9 N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />I N/A <br />® Yes <br />❑ No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />IL Comments: Replaced 91 MLLD. Re -tested and passed. <br />