My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:14:10 PM
Creation date
6/3/2020 9:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%SAN'JQAQ Environmen al Health Department <br /> COUNTY Linda Turkatte, REHS, Director <br /> cqOF6P Greatness grows here. Kasey Foley,REHS,Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> Rodney Estrada,REHS <br /> Willy Ng, REHS <br /> Muniappa Naidu, REHS <br /> September 1, 2017 <br /> Marty Weithman <br /> Able Maintenance <br /> 680 Quinn Ave. FILE <br /> �San Jose, CA 95112 <br /> Re: Unocal76 SR0078083 <br /> 2701 W March Lane <br /> Stockton CA 95219 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br /> application for a permit to excavate near the under dispenser containment of dispenser 11/12, and <br /> replace the 91 product bravo compression fittings on the underground storage tank (UST) system at <br /> the above noted address. Furthermore, the UST system had failed the secondary containment test in <br /> certain components on 11/30/16. The EHD was unable to witness secondary containment retesting in <br /> the failed areas (87 and diesel secondary product line, diesel turbine sump, and UDC 7/8) on 3/28/17, <br /> additional conditions have been listed below. The permit has been approved with the following <br /> conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Aaron Hang at (209) 468-3453 to arrange the following inspection appointments (a 48- <br /> hour notice is required for inspection appointments). Please be aware that inspections for <br /> emergency work must be scheduled within five days of permit approval. <br /> a. Primary piping soap test: One hour pneumatic pressure test for the 91-octane piping, at <br /> 110% of operating pressure, or 40 psi, whichever is greater. <br /> b. Secondary piping soap test: One hour pressure test of the 91-octane piping, per <br /> manufacturer's guidelines. If there are no manufacturer's guidelines, test shall be performed <br /> using an applicable method specified in an industry code or engineering standard. <br /> c. Secondary piping test for all product piping in the vicinity of UDC 11/12 (where excavation <br /> took place) after surface repairs/restorations: One hour pressure test for all piping, per <br /> manufacturer's guidelines. If there are no manufacturer's guidelines, test shall be performed <br /> using an applicable method specified in an industry code or engineering standard. <br /> d. 24 hour hydrostatic test (or equivalent) on UDC 11/12 sump. <br /> e. Secondary containment testing on the 87 secondary product line, diesel product line, diesel <br /> turbine sump, and UDC 7/8. <br /> 4. If concrete will be broken near the tank, a secondary containment test must be performed on <br /> the affected UST's once concrete is poured in accordance with the manufacturer's guidelines. <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.