Laserfiche WebLink
SWRCB,January 2002 Page—of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: Oj Piping Manufacturer 9,16dustry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: r-eessure 0 Vacuum 0 Hydrostatic <br /> ---0 <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# 3 Piping Run# <br /> Piping Material: <br /> Piping Manufacturer A, At, <br /> Piping Diameter: <br /> Length of Piping <br /> Run: <br /> Product Stored: ut1kf A, 61IR C"Z'60 K <br /> Method and location of <br /> piping-run isolation: ;A"fcl-4"9 07;'-1 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: > -4", <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: b:,Pass .111 0 Fail ❑ Pass:, Fail'D CT <br /> `Pass Pass ErFail: . <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> zc/) <br />