Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITY NAME �� I' 1 I H CI P-fi j G S DATE J I L L <br /> FACILITYADDRESS SII p ab r(C.) ArVL,-AUC , *4 0 CA - g520-+ <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> 2.Describe the frequency of performing the monitoring for: zooz <br /> TANKS l�fJ L PIPING Pq /L)e' -AL <br /> 3.Describe the location(s)of where the monitoring will be performed. ie:location of sensors <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel %X1C,,Cf IL? <br /> D <br /> Name and Model of Line Leak Detectors <br /> Name and Model of Annular Sensors <br /> Name and Model of Piping Sensors T�k CC Oic/ <br /> Name and Model of Dispenser Sensors SX/C o R./ T X/A- T 5 v <br /> Type of overfill prevention PZ-0% 7F-0 t5&- F Co-117- <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes❑ No Er <br /> Does the turbine shut down if a sensor is disconnected? Yes❑ No E�' <br /> Does the turbine shut down is the monitoring panel loses power? Yes❑ No pi <br /> r, How will the alarm history and subsequ nntenance be recorded? <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recor ling for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? �L Q � <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. <br /> I:\mstemi4e\UST\monitoringplan.doc <br /> 1/24/2002 <br /> i <br />