Laserfiche WebLink
PAGE THREE OV 6 <br />COVER THE TR NCHED AREA WITH HEAVY METAL PLATE IN ORDER THAT THE STATION <br />MAY REOPEN. ATERWORK SHALL THEN BE INSTRUCTED TO PROCEED WITH THE SITE <br />REMEDIATION PLAN• THIS STATION HAS ALSO ASKED FOR AN ESTIMATE TO INCLUDE <br />REPLACING ALL TANKS AND LINES WITH A COMPLETE DOUBLE WALL SYSTEM CONSISTENT <br />WITH THE REQUIREMENTS TO BRING THEM INTO FULL COMPLIANCE WITH ALL NEW CODES. <br />(B) NOT FAVORABLE: IF SYSTEM FAILS THE PRESSURE TEST SUBMIT NEW WORKPLAN <br />ADDRESSING ISSUES OF REMEDIATION TO SAN ,JOAUQIN tOUNTY ENVIRONMENTAL <br />HEALTH DIVISION. <br />WE APPRECIATE YOUR UNDERSTANDING OF THE NEED FOR EXPEDIENCY AND THE ECONOMIC <br />HARDSHIPS CURRENTLY BEING SUFFERED BY THE OWNER OF THIS BUSINESS. YOU HAVE INDICATED <br />A WILLINGNESS TO EXPEDITE ALL PERMITTING AND THE OWNER OF THE STATION, MIR. BRAR, <br />HAS INDICATED HIS WILLINGNESS TO COOPERATE IN EVERY WAY POSSIBLE. WE APPRECIATE <br />YOURS TRULY, <br />AMES ITZELL IV <br />JJH%NB VICE PRESIDENT AND LNVIRONMENTAL MIANAGER <br />ENCLOSURE <br />